Difference between revisions of "Intensive silgium exploitation"

From Perpetuum
Jump to: navigation, search
m (DEV Zoom moved page Intensive siligium exploitation to Intensive silgium exploitation without leaving a redirect)
Line 1: Line 1:
Each level of this extension reduces the cycle time of [[Help:Raw_materials|silgium]] exploitation by an additional 1%.
+
Each level of this extension reduces the cycle time of [[Silgium]] exploitation by an additional 1%.
  
 
==Prerequisites==
 
==Prerequisites==

Revision as of 01:15, 9 January 2013

Each level of this extension reduces the cycle time of Silgium exploitation by an additional 1%.

Prerequisites

Extension Level
Basic intensive mining 0