MPC - Deployment procedure

From Perpetuum
Jump to: navigation, search

Agents have to carry a foundation item to the exact place where they want to build the structure in question.

  • First they need to clean all the plants within the desired structure's occupied area and flatten the terrain until the construction marks (yellow ones in the slope capability display) disappear.
  • After the terrain is ready the agent can deploy the foundation. If all goes well they can activate the foundation and they can start the construction phase.
  • During this phase they have to use the construction module which is designed for this process.
  • When the required construction level reached, the node can be connected to a network and can be turned on. Creating a structure network is greatly aided by the Network Planner.

< Assignments | Table of contents | MPC - Energy transmission >